
26 Apr 2021
Construction of irrigation water supply with reusable water
Project data
Project of construction of irrigation water supply with reusable water in the Madrid municipality of Torrejón de Ardoz, composed of a total of 24 km of PVC pipe adequa URATOP® oriented with diameters between 110 and 400 in purple. Most of the work takes place in the town centre.